Hello, can anyone help me using UP Studio 3? I set layerheigt = 0.2mm. After slicing the first layer is only 0.09mm. Which setting do i have to change to get first layer 0.2mm?
Thanks a lot.
Regards
Jürgen
It is not layer thickness, but Z position of that layer in the coordinate.